gat-workflow-start — independently scanned and version-tracked by SaferSkills.
SaferSkills independently audited gat-workflow-start (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
This skill is the workflow router for the simplified project. Because milestones can be in progress at different stages at the same time, it outputs a status panel (not a single command) and recommends the earliest actionable step.
Read only gat/ paths. Do not read or consider legacy design/ or production/ paths.
Check for these files (all under gat/):
gat/overview/game.mdgat/overview/systems-index.mdgat/overview/art-direction.mdgat/narrative/*.mdgat/milestone/milestone.mdgat/milestone/m{N}-<name>/m{N}-brief.mdgat/milestone/m{N}-<name>/<system>/For each milestone that has an m{N}-brief.md, derive its stage from filesystem state:
planned — brief exists, all systems Pending (no GDDs on disk)designing — at least one system designed but not alldesigned — every in-scope system's GDD (and art/data where required) is on diskIf the brief's status field disagrees with filesystem state, derive the stage from filesystem state.
Report a short factual summary:
GAT Status:
Overview:
gat/overview/game.md [present | missing]
gat/overview/systems-index.md [present | missing]
gat/overview/art-direction.md [present | missing]
Narrative:
gat/narrative/*.md [N docs | missing]
Milestones (from gat/milestone/milestone.md):
M1 <name> [planned | designing | designed] (K/N systems designed)
M2 <name> [planned | designing | designed] (K/N systems designed)
...Use earliest-first priority to pick the primary recommendation, and list other valid actions:
gat/overview/game.md, gat/overview/systems-index.md, or gat/overview/art-direction.md is missing:recommend /gat-brainstorm (with optional hint). This is the earliest step.
gat/narrative/story.md does not exist:recommend /gat-story.
gat/milestone/milestone.md is missing:recommend /gat-milestone.
recommend /gat-design <that milestone> (continue) or /gat-design <that milestone> <system>.
designed but no later milestone needs design:state that the milestone is ready for engineering handoff (the user runs their downstream engineering workflow on that milestone directory; the brief includes detailed internal iterations for the downstream workflow to handle).
state that GAT pre-production is complete for all planned milestones and tell the user to hand milestones one at a time to their downstream engineering workflow.
Always also list other valid actions (e.g., "M1 ready for engineering; M2 designing — run /gat-design m2-<name> to continue M2").
End with one short line telling the user which command to run next (the primary recommendation), plus any alternative actions.
~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.