SaferSkills independently audited implementation-approach-78e4cf (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
Core Question: "What does the existing implementation look like?"
#### Analysis Framework
Architecture Analysis: Responsibility separation, data flow, dependencies, technical debt
Implementation Quality Assessment: Code quality, test coverage, performance, security
Historical Context Understanding: Current form rationale, past decision validity, constraint changes, requirement evolution#### Meta-cognitive Question List
Stop when another current-state fact cannot change responsibility, reuse, option validity, total complexity, a contract, or verification.
Completion evidence: inspected paths, observed architecture/data-flow facts, known constraints, inferred historical rationale labeled as inferred, and unknowns that could change strategy selection.
Transition: proceed when every strategy-relevant claim is observed, explicitly inferred with evidence, or recorded as unknown.
Core Question: "What is the smallest design that delivers the current required outcome, and what evidence forces each addition beyond it?"
Complete these steps in order before exploring implementation strategies:
Candidate paths and rejected additions remain active analysis. The durable output is the Selected Design: the complete chosen path plus evidence for each added design surface and the condition that fails when it is removed. Only an accepted ADR may retain alternatives as decision history. During implementation, use the same convergence check without producing a separate artifact.
Completion evidence: one complete Selected Design; every added design surface names its current evidence, why lower-surface resolutions fail, and its subtraction result.
Transition: proceed when every supporting claim is observed, explicitly inferred with evidence, or recorded as unknown; route an unknown that blocks the next step as an exact evidence prerequisite. User interaction is required only when the unknown requires changing the confirmed outcome, desired-future requirements, or non-goals, or authorizing an irreversible action.
Core Question: "When determining before -> after, what implementation patterns or strategies should be referenced?"
#### Strategy Discovery Process
Research and Exploration: repository patterns first; then official documentation for the resolved dependency version; then maintained OSS implementations; use literature/blogs only for supplementary alternatives and label them as non-authoritative
Creative Thinking: Strategy combinations, constraint-based design, phase division, extension point design#### Reference Strategy Patterns (Creative Combinations Encouraged)
Legacy Handling Strategies:
New Development Strategies:
Integration/Migration Strategies:
Completion evidence: at least two feasible candidate approaches when the decision is non-trivial, with each candidate mapped to the observed constraints it satisfies and the constraints it leaves unresolved.
Transition: proceed when candidates are comparable against the same constraint set.
Core Question: "What risks arise when applying this to the existing implementation, and which control measurably reduces likelihood or impact while preserving verification and rollback?"
#### Risk Analysis Matrix
Technical Risks: System impact, data consistency, performance degradation, integration complexity
Operational Risks: Service availability, deployment downtime, process changes, rollback procedures
Project Risks: Schedule delays, learning costs, quality achievement, team coordination#### Risk Control Strategies
Preventive Measures: Phased migration, parallel operation verification, integration/regression tests, monitoring setup
Incident Response: Rollback procedures, log/metrics preparation, communication system, service continuation proceduresCompletion evidence: each material risk has likelihood/impact evidence, one preventive or containment control, and a verification point.
Transition: proceed when every high-impact risk has either a control or a blocking escalation.
Core Question: "What are this project's constraints?"
#### Constraint Checklist
Technical Constraints: Library compatibility, resource capacity, mandatory requirements, numerical targets
Temporal Constraints: Deadlines/priorities, dependencies, milestones, learning periods
Resource Constraints: Team/skills, work hours/systems, budget, external contracts
Business Constraints: Market launch timing, customer impact, regulatory complianceCompletion evidence: each constraint is observed, inferred, or unknown; every unknown that can invalidate a candidate names the exact evidence prerequisite.
Transition: proceed when remaining unknowns cannot change the valid candidate set, or the user resolves them.
Select the approach that satisfies all hard constraints and current requirements with the lowest transition risk and smallest verification delay. Use lifecycle cost and implementation effort only as tiebreakers after requirement coverage, compatibility, and risk control are equal.
#### Vertical Slice (Feature-driven) Characteristics: Vertical implementation across all layers by feature unit Application Conditions: Low inter-feature dependencies, output in user-usable form, changes needed across all architecture layers Verification Method: End-user value delivery at each feature completion
#### Horizontal Slice (Foundation-driven) Characteristics: Phased construction by architecture layer Application Conditions: Foundation system stability important, multiple features depend on common foundation, layer-by-layer verification effective Verification Method: Integrated operation verification when all foundation layers complete
#### Hybrid (Creative Combination) Characteristics: Flexible combination according to project characteristics Application Conditions: Unclear requirements, need to change approach per phase, transition from prototyping to full implementation Verification Method: Assign L1 when the phase produces end-user-operable behavior, L2 when it produces a testable internal behavior or contract, and L3 only when the phase produces build-time structure with no runnable behavior yet
For Hybrid, assign one explicit L1/L2/L3 verification level and observable completion result to every phase.
Completion evidence: one selected approach, its phase boundaries, integration points, and a verification result for every phase.
Transition: proceed to documentation when the selected approach covers every hard constraint and its risks have controls. Otherwise return to candidate exploration (Phase 3), or to Design Convergence (Phase 2) when a Phase 4-5 result changes the Selected Design or its evidence.
Return the following structure in the Design Doc or planning handoff:
implementationApproachDecision:
observedConstraints: [<constraint + evidence>]
inferredConstraints: [<constraint + evidence and inference>]
unknowns: [<unknown + required evidence or decision>]
selectedApproach: <vertical | horizontal | hybrid description>
selectionRationale: <hard-constraint coverage, compatibility, risk control, and total-complexity basis>
addedDesignSurface: [<addition + current evidence + lower-surface insufficiency + subtraction result>]
phaseVerification: [<phase + L1/L2/L3 + observable completion evidence>]Candidate approaches and rejection reasoning remain active analysis unless an accepted ADR owns them as decision history.
Completion evidence: the selected approach and every added design surface trace to an observed constraint, accepted inference, or resolved value-boundary decision.
Priority for completion verification of each task:
Priority: L1 > L2 > L3 in order of verifiability importance
Define integration points according to selected strategy:
When evidence required by a checked item is unknown, stop at that phase and report the exact repository evidence prerequisite. User interaction is required only when the unknown requires changing the confirmed outcome, desired-future requirements, or non-goals, or authorizing an irreversible action.