sprint-status — independently scanned and version-tracked by SaferSkills.
SaferSkills independently audited sprint-status (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
When running multiple Claude Code sessions in parallel, confusion is the enemy. This skill ensures every session identifies itself and every step reports its state.
Every response that involves a decision, plan, or significant action starts with orientation:
SESSION: my-app | branch: feat/auth | task: Add JWT refresh tokensThis takes one line. It costs almost nothing. It prevents the user from applying feedback to the wrong session.
Check for sibling Claude Code processes:
pgrep -af "claude" | grep -v "$$" | head -5Or check for active worktrees:
git worktree list 2>/dev/nullOr look for session markers (written by session-start.js / session-end.js):
ls $TMPDIR/pro-workflow/sessions/ 2>/dev/null | tail -5If multiple sessions are detected, always include the session identification header. If only one session is running, include it at task boundaries and before presenting options.
End every major step with exactly one status line. No ambiguity.
All work for the current step is done. Ready to commit, merge, or move to the next task.
STATUS: COMPLETE
Changed: src/auth/refresh.ts, src/auth/refresh.test.ts
Tests: 14 pass, 0 fail
Ready to commit.Done, but flagging something the user should know about.
STATUS: COMPLETE_WITH_NOTES
Changed: src/api/upload.ts
Tests: 8 pass, 0 fail
Notes:
- Upload size limit is hardcoded to 10MB, should be configurable
- No rate limiting on this endpoint yet (separate task)Notes are for things that work but could be better. Not blockers — observations.
Cannot proceed without user input or an external dependency.
STATUS: BLOCKED
Blocker: Need database migration approved before writing the ORM layer
Waiting on: DBA approval for schema change in migrations/0042_add_tokens.sql
Can continue: Nothing else in this task until unblockedMissing context to make a good decision. Asking before guessing.
STATUS: NEEDS_INFO
Question: Should refresh tokens expire after 7 days or 30 days?
Impact: Changes token cleanup job schedule and storage requirements
Default if no preference: 7 days (more secure, standard practice)Always provide a sensible default so the user can say "go with the default" without context-switching into the decision.
Session 1: feat/auth → implementing JWT refresh
Session 2: feat/auth-tests → writing test suite for auth moduleBoth sessions work on the same feature but don't touch the same files. Session 2 can start writing tests against the interface before Session 1 finishes the implementation.
Session 1: feat/upload → file upload endpoint
Session 2: feat/billing → billing webhook handler
Session 3: fix/login-bug → login redirect fixCompletely independent. Merge order doesn't matter.
Session 1: feat/base-types → shared type definitions (must merge first)
Session 2: feat/api → API layer (depends on Session 1)
Session 3: feat/ui → UI layer (depends on Session 1)Session 1 merges first. Sessions 2 and 3 rebase after. Flag the dependency in every status update.
| Event | Include Status? |
|---|---|
| File edit completed | No (too granular) |
| Test suite run | Yes, if pass/fail changed |
| Phase completed (research, plan, implement) | Yes |
| Presenting options to user | Yes (with session header) |
| Hitting a blocker | Yes, immediately |
| Before asking a question | Yes (NEEDS_INFO) |
| After committing | Yes (COMPLETE) |
| End of session | Yes (final status) |
When the user asks for status across sessions, compile a sprint view:
SPRINT STATUS
Session 1: feat/auth STATUS: COMPLETE (ready to merge)
Session 2: feat/upload STATUS: BLOCKED (waiting on S3 creds)
Session 3: fix/login-bug STATUS: COMPLETE_WITH_NOTES (works, needs perf review)## Sprint Status
Every decision and plan starts with: SESSION: project | branch | task
End major steps with STATUS: COMPLETE | COMPLETE_WITH_NOTES | BLOCKED | NEEDS_INFO
NEEDS_INFO always includes a sensible default.
When parallel sessions are detected, always include session headers.~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.