tool-foundation-sprint-readiness — independently scanned and version-tracked by SaferSkills.
SaferSkills independently audited tool-foundation-sprint-readiness (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->
Assess whether a Foundation Sprint fits the team's current situation. Most sprints that fail were sprints that should not have been run. A 30-45 minute readiness diagnostic catches that failure mode before two days of facilitated work are spent.
Family contract: docs/reference/skill-families/foundation-sprint-skills-contract.md. This skill is a member of foundation-sprint-skills and conforms to the family frontmatter and Decider Checkpoint requirements.
tool-foundation-sprint-brief instead.A single bundled artifact with five sections:
See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for a worked example using the Brainshelf book-catalog thread.
The skill runs an inference pass over these inputs to produce the verdict:
| Input | What the skill does with it |
|---|---|
| Initiative description | Determines whether a Foundation Sprint is the right tool (vs problem framing, customer research, or a Design Sprint) |
| Team composition draft | Checks roster against the Foundation Sprint role requirements; flags missing roles |
| Decider name and availability | Confirms Decider can attend both days; flags partial availability as Conditional Go risk |
| Existing customer/market knowledge level (self-assessed 1-10) | Below 5 indicates deep discovery is needed first; 5-7 indicates Conditional Go with research prep; 8+ indicates Go |
| (Optional) Existing competitor and alternative knowledge | Flags gaps that can be closed by overnight prep |
| (Optional) Logistics constraints | Confirms two days can actually be cleared |
If a load-bearing input is missing or low-confidence, the skill flags it explicitly and proposes how to close the gap before the sprint.
The skill evaluates the team against these eight criteria, drawn from Knapp/Zeratsky (Click) and Character Capital's Foundation Sprint guide:
| Pattern | Verdict |
|---|---|
| All 8 criteria met cleanly | Go |
| 1-2 criteria are "yellow flags" but addressable in evening prep | Conditional Go with documented prep |
| 3 or more criteria fail, or any of 1-4 is a hard fail | Wait with recommended prerequisite work |
Treat the criteria as load-bearing, not a checklist to game. A team that papers over a real gap with "yes, technically" should get a Conditional Go with the gap surfaced.
This skill is the entry point of the foundation-sprint-skills family. It has no prerequisites (the metadata.prerequisites field is intentionally empty).
When the verdict is Go, the natural next invocation is tool-foundation-sprint-brief to set up the sprint logistics. When the verdict is Wait, the team typically does prerequisite work (problem framing, customer research) before re-invoking this skill.
tool-note-and-vote may be invoked once during the readiness conversation if the team disagrees on whether a Foundation Sprint is the right tool. In practice, this is rare; the diagnostic is usually conclusive.
This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider signs off on the verdict (Go / Conditional Go / Wait) and explicitly accepts the diagnosis. Without Decider sign-off, the verdict is advisory; with sign-off, it is the commitment that triggers (or postpones) the sprint.
~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.