creating-oracle-to-postgres-master-migration-plan — independently scanned and version-tracked by SaferSkills.
SaferSkills independently audited creating-oracle-to-postgres-master-migration-plan (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
Analyze a .NET solution, classify every project for Oracle→PostgreSQL migration eligibility, and write a structured plan that downstream agents and skills can parse.
Progress:
- [ ] Step 1: Discover projects in the solution
- [ ] Step 2: Classify each project
- [ ] Step 3: Confirm with user
- [ ] Step 4: Write the plan fileStep 1: Discover projects
Find the Solution File (it has a .sln or .slnx extension) in the workspace root (ask the user if multiple exist). Parse it to extract all .csproj project references. For each project, note the name, path, and type (class library, web API, console, test, etc.).
Step 2: Classify each project
Scan every non-test project for Oracle indicators:
Oracle.ManagedDataAccess, Oracle.EntityFrameworkCore (check .csproj and packages.config)appsettings.json, web.config, app.configOracleConnection, OracleCommand, OracleDataReader.github/oracle-to-postgres-migration/DDL/Oracle/ (if present)Assign one classification per project:
| Classification | Meaning |
|---|---|
| MIGRATE | Has Oracle interactions requiring conversion |
| SKIP | No Oracle indicators (UI-only, shared utility, etc.) |
| ALREADY_MIGRATED | A -postgres or .Postgres duplicate exists and appears processed |
| TEST_PROJECT | Test project; handled by the testing workflow |
Step 3: Confirm with user
Present the classified list. Let the user adjust classifications or migration ordering before finalizing.
Step 4: Write the plan file
Save to: .github/oracle-to-postgres-migration/Reports/Master Migration Plan.md
Use this exact template — downstream consumers depend on the structure:
# Master Migration Plan
**Solution:** {solution file name}
**Solution Root:** {REPOSITORY_ROOT}
**Created:** {timestamp}
**Last Updated:** {timestamp}
## Solution Summary
| Metric | Count |
|--------|-------|
| Total projects in solution | {n} |
| Projects requiring migration | {n} |
| Projects already migrated | {n} |
| Projects skipped (no Oracle usage) | {n} |
| Test projects (handled separately) | {n} |
## Project Inventory
| # | Project Name | Path | Classification | Notes |
|---|---|---|---|---|
| 1 | {name} | {relative path} | MIGRATE | {notes} |
| 2 | {name} | {relative path} | SKIP | No Oracle dependencies |
## Migration Order
1. **{ProjectName}** — {rationale, e.g., "Core data access library; other projects depend on it."}
2. **{ProjectName}** — {rationale}Order projects so that shared/foundational libraries are migrated before their dependents.
~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.