SaferSkills independently audited skill-cost-projections (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
Projects remaining workflow cost based on per-phase averages from completed work. Displays cost data in the HUD/statusline and warns when projected totals exceed a configured budget ceiling.
Minimum data requirement: Needs 2+ completed steps before projecting. With fewer than 2 data points, the average is unreliable — display actual spend only and skip projection.
Read cost data from ~/.claude-octopus/metrics/ or from metrics-tracker.sh output. Each completed phase/step should have an associated cost entry.
# Read metrics from the session metrics directory
METRICS_DIR="$HOME/.claude-octopus/metrics"
SESSION_METRICS="$METRICS_DIR/session-$(date +%Y%m%d).jsonl"
# Each line contains: {"phase": "discover", "cost": 0.42, "tokens_in": 12000, "tokens_out": 3400, "timestamp": "..."}
# Sum costs from completed steps
completed_costs=$(jq -s '[.[].cost]' "$SESSION_METRICS")
completed_count=$(jq -s 'length' "$SESSION_METRICS")
total_spent=$(jq -s '[.[].cost] | add' "$SESSION_METRICS")Data sources (in priority order):
~/.claude-octopus/metrics/session-*.jsonl — structured per-phase cost entriesmetrics-tracker.sh output — fallback for legacy sessionsIf fewer than 2 completed steps are available, display only actual spend:
💰 Spent: $0.42 (1 step complete — need 2+ for projection)Calculate the mean cost across all completed steps.
avg_cost=$(echo "$total_spent / $completed_count" | bc -l)Formula:
avg_cost = total_cost / completed_stepsExample: If 3 steps cost $0.30, $0.50, $0.40 → avg = $1.20 / 3 = $0.40/step
Multiply the average cost per step by the number of remaining steps.
remaining_steps=$((total_steps - completed_count))
projected_remaining=$(echo "$avg_cost * $remaining_steps" | bc -l)
projected_total=$(echo "$total_spent + $projected_remaining" | bc -l)Formula:
projected_remaining = avg_cost × remaining_steps
projected_total = total_spent + projected_remainingStep counts by workflow type:
| Workflow | Total Steps | Example Phases |
|---|---|---|
| embrace | 4 | Discover, Define, Develop, Deliver |
| research | 3-7 | Per-agent probe count |
| review | 3 | Fleet, Verifier, Synthesis |
| debate | 3 | Opening, Rebuttal, Synthesis |
Format the cost projection for the HUD/statusline display.
Standard display:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00Format rules:
~ to indicate estimate💰 prefix for the cost lineWhen insufficient data (< 2 steps):
💰 Spent: $0.42 (need 2+ steps for projection)Integration: This display line is emitted by the octopus-hud hook and rendered in the statusline alongside phase progress and provider status.
If the OCTO_BUDGET_CEILING environment variable is set, compare the projected total against it and warn on overrun.
if [[ -n "${OCTO_BUDGET_CEILING:-}" ]]; then
ceiling="$OCTO_BUDGET_CEILING"
if (( $(echo "$projected_total > $ceiling" | bc -l) )); then
overage=$(echo "$projected_total - $ceiling" | bc -l)
echo "⚠️ Budget ceiling: \$$ceiling — projected to exceed by \$$overage"
fi
fiDisplay when over budget:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
⚠️ Budget ceiling: $5.00 — projected to exceed by $1.00Display when within budget:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
✅ Within budget ceiling: $10.00Note: OCTO_BUDGET_CEILING is optional. When unset, no ceiling check is performed.
If the projected total is high relative to the task, suggest switching to the budget profile to reduce costs.
# Suggest budget profile when projected total exceeds $5.00 (configurable)
COST_THRESHOLD="${OCTO_COST_THRESHOLD:-5.00}"
if (( $(echo "$projected_total > $COST_THRESHOLD" | bc -l) )); then
echo "💡 Tip: Switch to OCTO_PROFILE=budget to reduce costs"
fiDisplay:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
💡 Tip: Switch to OCTO_PROFILE=budget to reduce costsThe budget profile (OCTO_PROFILE=budget) routes to cheaper models and reduces agent count to minimize spend.
Normal — within budget, moderate cost:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00Over budget ceiling:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
⚠️ Budget ceiling: $5.00 — projected to exceed by $1.00
💡 Tip: Switch to OCTO_PROFILE=budget to reduce costsEarly in workflow (insufficient data):
💰 Spent: $0.42 (need 2+ steps for projection)Low cost — no warnings:
💰 Spent: $0.80 | Est. remaining: $0.80 | Total: ~$1.60The cost projection line is rendered as part of the HUD statusline output, updated after each phase completes.
Reads per-phase cost data written by the metrics tracker. Each completed phase logs cost, token counts, and provider details.
When OCTO_PROFILE=budget is active, the projection accounts for reduced per-step costs from cheaper model routing.
No metrics directory:
💰 Cost projection unavailable — no metrics data foundCorrupted metrics data: Skip malformed entries and project from valid data only. If no valid entries remain, show unavailable message.
Zero remaining steps: When all steps are complete, show final total only:
💰 Final cost: $4.80 (4 steps)~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.