pm-prd-drafter — independently scanned and version-tracked by SaferSkills.
SaferSkills independently audited pm-prd-drafter (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
Helps a PM produce a PRD that holds up under exec review. The PRD template at templates/prd-template.md is the substrate. The job of this skill is to make sure each section earns its keep — and to push back hard when sections are filler.
Use this when:
Don't use this when:
pm-decision-coach or frameworks/01-strategy-and-discovery.md firstpm-evaluatorpm-launch-reviewerdecision-making/problem-framing.md: [specific user] is trying to [specific job] but [specific blocker], which costs them [specific cost]. If any of the four slots is generic ("users", "better experience", "blocked", "frustration"), stop and re-write before any other section. A weak problem statement makes every later section meaningless.templates/prd-template.md § Why now. If the user can't name what changed (new capability, behavior shift, competitive threat, regulatory event), the PRD isn't ready. Say so and recommend deferring.decision-making/metrics.md — every load-bearing strategic assumption needs a falsifying metric. "Increase engagement" is not a success metric. A specific metric, threshold, segment, and timeline is.rubrics/pm-evaluation-rubric.md criterion 3. What's upstream (procurement, admin, onboarding)? What's downstream (support, billing, downstream teams)? If the PRD is silent on these, name the gap.For a fresh draft, produce the full PRD using templates/prd-template.md headings, with the problem and success-criteria sections fully concrete.
For a critique, use:
## TL;DR
[One-paragraph honest take. Is this PRD ready to circulate? Yes / no / not yet, why.]
## Problem statement
**Verdict:** [Specific / generic / wrong-problem]
[Quote the current problem statement, then re-write it concretely.]
## Why now
**Verdict:** [Real / forced / missing]
[What changed, or why this section is empty.]
## Solution
**Verdict:** [User-outcome / feature-list]
[Translate any feature-list lines into outcome language.]
## Success / kill criteria
**Verdict:** [Falsifiable / generic / missing]
[For each criterion: name the metric, threshold, segment, timeline. Re-write any that fail this bar.]
## Scope and bundle
**Verdict:** [Journey-aware / surface-only]
[Name what's missing from the journey: procurement, admin, downstream.]
## Load-bearing assumption
[The one belief this PRD depends on. State it explicitly so the exec audience can attack it directly.]
## Two or three specific re-writes
1. [Section, current line, replacement line, reason.]
2. ...Before circulating a PRD that's heading into a launch decision or a build commitment, run the output of this skill through pm-red-team. This skill stress-tests the PRD on its own terms; the red-team pass applies a different lens (stakeholder, viability, execution, or counter-recommendation) and is built to challenge rather than defer. Especially worth chaining when the team is unanimous — agreement is when blind spots are most likely.
~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.