plot-structure — independently scanned and version-tracked by SaferSkills.
SaferSkills independently audited plot-structure (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
Plan and manage story arcs, plot points, foreshadowing, and narrative timeline. Each arc is a markdown file in plot/arcs/ with a chronological timeline maintained in plot/timeline.md. The plot index tracks all arcs, their status, and theme coverage.
A story project must already exist (created via the story-init skill). Verify by checking for story.md in the project root.
story.md for genre and themesreferences/structure-models.md for available structuresplot/_index.md frontmatter structure fieldstory.md for themesplot/_index.md for existing arcscharacters/_index.md to understand available charactersreferences/arc-template.mdplot/arcs/{arc-name-kebab}.mdplot/_index.md arcs tableplot/_index.mdcharacters/Plot points live within arc files in the "Plot Points" table. When adding a plot point:
plot/timeline.md in chronological orderThe timeline at plot/timeline.md is a chronological master list of all story events across all arcs.
When adding events:
When reviewing the timeline:
Each arc tracks its own foreshadowing in the "Foreshadowing" table:
planted or paid-offDuring chapter writing, flag any planted items that haven't been paid off as reminders.
characters fieldthemes fieldplot/_index.md maps themes to arcs and chapters~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.