jama-reporting-standards — independently scanned and version-tracked by SaferSkills.
SaferSkills independently audited jama-reporting-standards (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
| Design | EQUATOR guideline | Mandatory diagram |
|---|---|---|
| Randomized clinical trial | CONSORT | CONSORT participant-flow diagram |
| Observational (cohort, case-control, cross-sectional) | STROBE | Participant-flow diagram strongly expected |
| Systematic review ± meta-analysis | PRISMA | PRISMA study-selection flow diagram |
| Diagnostic-accuracy study | STARD | STARD participant-flow diagram |
| Study protocol | SPIRIT | Schedule of enrollment/assessments |
| Prediction model | TRIPOD | — |
| Quality-improvement study | SQUIRE | — |
| Other designs | The matching EQUATOR guideline | per guideline |
Always check the EQUATOR Network and JAMA's Instructions for Authors for the current guideline list and any JAMA-specific extensions or required checklist file.
Vignette (illustrative): a multicenter randomized clinical trial, N = 2,800 adults with sepsis, primary outcome 90-day mortality, absolute risk difference -3.1 percentage points (95% CI, -5.8 to -0.4). At the Journal of the American Medical Association this maps to CONSORT with a mandatory participant-flow diagram accounting for everyone screened, randomized, and analyzed; the completed CONSORT checklist must carry page/line locations, the title must state "randomized," and the abstract follows CONSORT-for-abstracts. Had the same question been answered by a cohort, the map would shift to STROBE with both unadjusted and adjusted estimates; a systematic review would shift to PRISMA with a study-selection diagram and a GRADE certainty assessment.
Calibration anchors (hedge where uncertain): the design-to-guideline mapping and the mandatory flow diagram for RCTs and reviews are durable; JAMA-specific extensions and required checklist files evolve — confirm against the EQUATOR Network and current author guidelines.
Run this as a concrete capability pass. First lock the clinical question, patient population, estimand or endpoint, safety/ethics issue, and reporting checklist; then test whether the manuscript addresses clinical reviewers who ask whether the evidence changes patient care, policy, or medical decision-making while satisfying reporting standards.
claim / evidence / blocker / next edit rows so the next pass can patch the manuscript directly.resources/official-source-map.md for volatile rules and name the one unresolved fact that could change the recommendation.【Design】...
【Guideline】CONSORT / STROBE / PRISMA / STARD / other
【Flow diagram drafted】yes / no
【Checklist file complete with locations】yes / no
【Items still unreported】...
【Next skill】jama-statistics~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.