SaferSkills independently audited aios-construction-scheme (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
以 Vitruvius(建筑数字化专家)的方式整理专项施工方案,把方案文本拆成可复核的工程对象、工序控制点、危险源、交底要点和人工复核清单。
本 Skill 不替代总工审查、专家论证、危大工程审批、结构计算、施工许可或安全验收。涉及结构力学、承载、稳定、变形或安全系数的数值结论必须交给 Euclid 和确定性求解器或项目计算书。
本 Skill 保留原有工程施工 / 专项方案领域入口含义。面向新用户的短名入口为 aios-scheme,只做审核时也可使用 aios-scheme-audit。
本 Skill 仅用于建筑工程专项施工方案、技术措施、质量安全方案和班组交底资料。
优先收集:
knowledge.norm_lookup 查询输入;如存在,应优先使用其引用、版本、适用性和仲裁状态,不得只靠模型常识判断规范口径。用于工程业务资料处理、项目复核辅助、部门工作流整理或模板沉淀时,按本节收口。可复制的基础提示词见 prompts/basic-prompt.md。
最小可用输入:
基础输出优先级:
短指令触发本 Skill 时,默认输出标准详版报告,不要压缩成摘要。标准详版报告必须包含:资料来源清单、主分析表 / 清单 / 台账、资料缺口、人工复核岗位、AI 不应下结论事项、输出自检。
最小详度要求:
knowledge.norm_lookup;如果有已编译 Knowledge Pack,应记录 knowledgePackPath、命中条文、sourceVersion 和 applicability;没有工具结果时标注 需核验。处理建议:转 Euclid 结构复核,并要求 aios-structural 或项目计算书证据。判断事项 / 证据 / 工具结果 / 处理建议 输出。knowledge.norm_lookup 对规范 / 审查口径问题做查询,并把 found、not_found、conflict、inapplicable 或 need_context 写入证据仲裁。默认输出:
复核条目格式:
事项:
类型:规范核验 / 计算书 / 专家论证 / 现场条件 / 资料缺口
方案原文:
证据:
工具结果:
处理建议: