SaferSkills independently audited capacity-planner (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
Sizing tool for ops teams that handle queued work — Support, CX, Customer Success, BizOps, IT ops, Finance ops. Built on Erlang-C queueing theory, Little's Law, and the operational-leadership canon (Fournier, Larson, Cleveland, Reinertsen). Deterministic, stdlib-only, no LLM calls.
You are an ops leader sized 15 → 35 with no idea how the 35-person org will actually behave at peak load. Or you are at 88% utilization and SLA is starting to slip. Or you have a hiring budget approved and need to sequence it across four quarters without burning out the existing team. This skill answers those questions with arithmetic, not vibes.
It produces three artifacts:
demand, with P(SLA breach) at each point and a SAFE/WATCH/AT_RISK/CRITICAL risk band.
team verdict (HEALTHY/SQUEEZED/OVERLOADED/UNBALANCED).
attrition, QoQ demand growth, and span-of-control manager triggers.
fiscal year).
to your CFO.
whether it's a sizing problem, a process problem, or a bottleneck problem.
combined org.
your work system (Zendesk, Intercom, JSM, ServiceNow, Salesforce). If you only have averages, stop and pull the distribution. Single- point demand estimates are the most expensive anti-pattern in ops.
capacity_modeler.py with your demand,AHT, SLA target, current FTE, and shrinkage. Use --profile for your function (support / cx / bizops / finance-ops / it-ops). Read the 80%-utilization row — that's your sizing point.
utilization_analyzer.py againstyour current team's actual utilization data. Anyone >85% sustained is a throughput-collapse risk per Reinertsen. Spread >30 percentage points across team means UNBALANCED — fix that before hiring.
hiring_sequencer.py with current FTE,target EOY, ramp time, attrition, and growth. It will front-load hires (Q1 35%, Q4 15%), apply ramp curves, and trigger a manager hire when span of control crosses 7 ICs/manager.
a time. Do not skip ahead. Answers must be written down before you commit the plan.
scripts/capacity_modeler.py — Erlang-C sizing with shrinkageadjustment and P50/P90/P99 breach probabilities. --profile for industry defaults.
scripts/utilization_analyzer.py — per-member traffic-light +team-level health verdict with variance detection.
scripts/hiring_sequencer.py — 12-month quarterly plan with ramp,attrition, growth, max-hires-per-quarter constraint, and manager-trigger logic.
All three accept --input <path> (JSON), --output {markdown,json}, --sample (built-in example), and --help. Stdlib only.
# Emits an Erlang-C capacity model (required headcount + P50/P90/P99 breach probabilities) for the built-in example
cd business-operations/skills/capacity-planner && python3 scripts/capacity_modeler.py --samplereferences/queueing_theory_canon.md — Erlang, Little, Hopp &Spearman, Reinertsen, Kingman, Cleveland, ITIL, Armony et al. (8 sources). The math.
references/ops_workforce_planning_canon.md — Fournier, Larson,Google SRE Workbook, Frei, Lawler, Bersin, Gartner, Grove (8 sources). The people factors.
references/capacity_anti_patterns.md — 11 named anti-patternswith cited sources, tool guards, and the meta-discipline that Lencioni + Goldratt + Christensen impose. (8+ named sources.)
assets/capacity_brief_template.md — 20-minute fill-out templatewith JSON skeletons for all three tools and an output checklist.
This skill assumes:
If your team's work isn't queued, this is the wrong skill.
Step-changes (new product launch, M&A, regulatory shift) require re-running mid-quarter.
P50/P90/P99. If not, generate the distribution from your sales / user-base forecast first.
priority tiers (P1/P2/P3 with class-specific SLAs), model each as a separate queue and sum.
appropriate --profile with built-in shrinkage premium.
See references/capacity_anti_patterns.md for the full taxonomy with sources. Top eight:
via DORA 4 metrics, story points, deployment frequency, and cycle time bottlenecks. It is for engineering teams shipping code. This skill is for ops teams handling tickets/cases. Different unit of work, different math (Erlang-C vs. DORA), different bottleneck (queueing-blind staffing vs. WIP + lead time).
planning (1-5 year capability portfolios, talent supply, leadership succession). This skill does operational 0-12 month capacity sizing against demand. Per Lawler: conflating them gets you hired into the wrong jobs.
(Jira velocity, sprint capacity). This skill sizes around steady- state queued work.
sizes the team around a known bottleneck. Order of operations: process-mapper first → capacity-planner second. Hiring around the wrong constraint wastes the hires.
Success coverage by ARR/CSM ratio and segment. This skill sizes by queued work volume (tickets, cases, escalations). For a CS team that handles both relationship work AND a ticket queue, run both.
Discipline: walk these one at a time. Do not skip ahead. Answers must be written down. If you can't answer one, that is your next investigation.
Recommended answer: a named, measured stage in the workflow with queue-time data showing where work waits. Not a vibe. Not "escalations take too long". An actual measured queue.
Why it's the first question: Goldratt (The Goal, 1984) — every system has exactly one binding constraint at a time. Sizing around the wrong constraint wastes hires entirely. If you do not know your bottleneck, run process-mapper BEFORE this skill.
Canon: Eli Goldratt, The Goal (1984); Reinertsen, Principles of Product Development Flow (2009).
Recommended answer: a written, explicit choice — fast vs. empathetic, broad vs. deep, low-cost vs. high-quality. Frances Frei is unambiguous: you cannot win all four. The team that tries wins zero.
Why it matters: AHT, SLA, and shrinkage inputs are the operational expression of this trade-off. If they don't agree (e.g., you set AHT for "empathy" but SLA for "speed"), the plan is internally inconsistent.
Canon: Frances Frei & Anne Morriss, Uncommon Service (HBR Press, 2012).
Recommended answer: two specific numbers from the last 90 days of data, with the calendar context of each (e.g., "P90 was 480 tickets/day on normal Tuesdays; P99 was 720 on the day after the November release"). A team sized to P50 misses SLA half the time. A team sized to P99 overstaffs by 30-50%. P90 is the right operating sizing point per Cleveland.
Canon: Brad Cleveland, Call Center Management on Fast Forward (4th ed., 2019); A.K. Erlang, The Theory of Probabilities and Telephone Conversations (1909).
Recommended answer: two probabilities, computed (not guessed) from Erlang-C with your specific N, AHT, and SLA target. If P(breach at P90)
10% you are understaffed at the sizing point. If P(breach at P99) >
50% you have no surge plan and the next peak event will be visible to the CEO.
Canon: Erlang (1909); Hopp & Spearman, Factory Physics (3rd ed., 2008), VUT equation.
Recommended answer: yes, with a specific number. At 30% annual attrition (Bersin BPO midpoint), a 20-FTE team loses ~6 people this year. If your "add 5 net" plan is actually a "hire 11" plan, the recruiting volume changes drastically. Anti-pattern #3.
Canon: Bersin/Deloitte talent benchmarks (2015-2023); Edward Lawler, Strategic Workforce Planning (USC CEO, 2008).
Recommended answer: a specific quarter (from hiring_sequencer.py) and at least one identified candidate (internal lead or external hire). Past 7 ICs/manager, 1:1s degrade, feedback cycles slip, attrition climbs. Past 10 you have a coverage crisis. Hire the manager BEFORE crossing 10, not after.
Canon: Camille Fournier, The Manager's Path (O'Reilly, 2017), ch. 5; Andy Grove, High Output Management (1983).
Recommended answer: an explicit, documented plan — overflow tier, BPO contracted capacity, on-call rotation, executive escalation tree, OR a written degradation contract that says "on P99 days we extend SLA to X minutes and notify customers proactively". If the answer is "we'll figure it out", the P99 day is a fire visible to the board.
Canon: Hopp & Spearman, Factory Physics (2008); Reinertsen (2009) on capacity-margin discipline.
Walk these seven in order. One at a time. Write the answers down. The plan you submit is only as defensible as your answers to these seven questions.