state-manager-553434 — independently scanned and version-tracked by SaferSkills.
SaferSkills independently audited state-manager-553434 (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
.arch/state.jsonThis file is the single source of truth for project progress. ALWAYS read it before responding to architecture queries. ALWAYS update it after state changes.
current_phase to know where we aresub_phase and individual acceptance flags (pattern_accepted, components_overview_accepted, cross_cutting_accepted)components object for per-component statusreopens.count and reopens.max for reopen availabilitynot_started → evaluation (when /analyze-prd runs)
evaluation → methodology (when Phase 1 is accepted)
methodology → components (when Phase 2 is fully accepted: pattern + components + cross-cutting)
components → finalization (when ALL components accepted)Backward transitions are ONLY allowed via /reopen (max 2 per project).
pattern → components_overview → cross_cuttingEach sub-phase is accepted independently via /accept. All three must be accepted for Phase 2 to be complete.
pending → in_progress (when /design-component starts)
in_progress → awaiting_acceptance (when design is presented)
awaiting_acceptance → accepted (when user accepts)
awaiting_acceptance → in_progress (when user refines)
needs-review → in_progress (after a reopen cascades)When updating state.json:
decision_count if a decision was made.arch/decisions.mdAppend-only file. Never edit previous entries. Format:
### [DEC-NNN] Phase X | Category
- **Decision:** [What was decided]
- **Rationale:** [Why this choice]
- **Alternatives:** [What else was considered]
- **Trade-offs:** [What was sacrificed]
- **Risk:** [Any residual risk]
- **Supersedes:** [DEC-NNN — only if this replaces a previous decision]
- **References:** [FR-NNN, DEC-NNN — only if tracing to requirements or cross-cutting decisions]
- **Date:** [ISO timestamp]Categories: Requirements | Pattern | Technology | Integration | Security | Infrastructure | Process | Reopen
Supersedes and References are optional. Omit the line entirely when not applicable.
Supersedes — Use when a decision replaces a previous one:
/reopen creates a new decision that supersedes the original acceptance decision for the reopened target/alternative creates a new decision that supersedes the previous proposal's decision**Supersedes:** DEC-003 (single) or **Supersedes:** DEC-003, DEC-007 (multiple)References — Use when a decision traces to requirements or earlier decisions:
**References:** FR-001, FR-003, DEC-005Example — supersession (reopen scenario):
### [DEC-012] Phase 2A | Reopen
- **Decision:** Reopened architecture pattern selection
- **Rationale:** New compliance requirement invalidates serverless approach
- **Alternatives:** Could have added compliance layer on top of existing pattern
- **Trade-offs:** Progress reset on 5 items
- **Risk:** Reopens remaining: 1 of 2
- **Supersedes:** DEC-004
- **Date:** 2026-03-11T14:00:00ZExample — traceability (component design):
### [DEC-015] Phase 3 | Technology
- **Decision:** Selected PostgreSQL 16 for order-service data store
- **Rationale:** ACID compliance required for financial transactions; team has production experience
- **Alternatives:** MongoDB 7 (flexible schema but lacks native ACID), CockroachDB 24 (distributed but overkill)
- **Trade-offs:** Schema migrations required; less flexibility than document store
- **Risk:** Single-node bottleneck if order volume exceeds 50K TPS
- **References:** FR-003, FR-012, DEC-008, DEC-009
- **Date:** 2026-03-11T15:30:00ZLog a decision entry for:
~30 seconds. Free. No account. Every finding cites a rule and a line of evidence.