SaferSkills independently audited agile-v-lifecycle (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
Multi-cycle lifecycle management for Agile V. Requires agile-v-core loaded first.
C1, C2, ... -- recorded in STATE.md, propagated to all artifact IDs.
| Document | Rule | Example |
|---|---|---|
.agile-v/REQUIREMENTS.md | Revision header + per-REQ lifecycle state | <!-- Revision: C2 --> |
| BUILD_MANIFEST.md | ART-XXXX.N suffix | ART-0001.2 |
| TEST_SPEC.md | TC origin cycle | TC-0001 [C1] |
.agile-v/VERIFICATION_SUMMARY.md | One per cycle; prior archived | VERIFICATION_SUMMARY_C1.md |
| DECISION_LOG.md | Cycle-tagged entries | [C2] DECISION: ... |
| ATM.md | Partitioned by cycle | See compliance-auditor |
Use canonical states draft_persisted -> independent_findings -> architect_revisions -> gate_1 -> approved -> baselined; changes create a new revision in architect_revisions, while retirement uses retired. Record cycle and change class (new, modified, unchanged) separately. Legacy values require the migration mapping in the canonical lifecycle contract.
Append-only in .agile-v/CHANGE_LOG.md. Format: CR-XXXX with Cycle, affected REQ-XXXX revision/baseline, change, rationale, ART/TC impact, requester, and approval status. Flow: Requirement Architect creates a new draft revision -> Logic Gatekeeper records findings without editing -> Requirement Architect resolves findings -> Human decides at Gate 1 -> approved revision is captured in a new immutable baseline. A CR is the only mechanism that may change the frozen verification baseline of an active cycle (docs/agile-v-runtime/07_EVIDENCE_ADMISSION_CONTRACT.md); Evolve findings from the current cycle propose CRs, they do not apply directly.
(1) New feature request. (2) Verification failure requiring REQ change. (3) Approved CR invalidating artifacts. (4) Scheduled iteration. All require Human decision.
| Trigger | Re-Entry | Scope |
|---|---|---|
| New feature | Stage 1 | Full pipeline new REQs; regression unchanged |
| REQ change from verification | Stage 1 | CR -> Gate 1 -> full affected; regression others |
| Bug fix (no REQ change) | Stage 3 | Build fixes; re-verify affected only |
| Scheduled | Stage 1 | Review all; full for changes; regression stable |
On Gate 2 acceptance: snapshot living docs -> .agile-v/cycles/CN/ (frozen). Never modify archives. DECISION_LOG and CHANGE_LOG never archived -- append-only timeline.
(1) Req Architect: tag REQs new/modified/deprecated/unchanged. (2) Logic Gatekeeper: re-validate new+modified only. (3) Build Agent: rebuild modified only; carry forward unchanged. (4) Test Designer: delta tests for new/modified; regression baseline for unchanged. (5) Red Team: execute delta + regression separately. (6) Compliance Auditor: cycle-tag ATM; flag unupdated links.