SaferSkills independently audited agile-v-lifecycle (Agent Skill) and scored it 100/100 (green). The audit ran 55 deterministic rules across Security, Supply Chain, Maintenance, Transparency, and Community; it found 0 high-severity and 0 lower-severity findings. The full rule-by-rule trace and per-finding evidence are below. Free, methodology-open.
Findings & checks · 0 flagged
Every scanned point with the score it earned and what moved between them.
First recorded scan — no prior version to compare against.
The primary manifest — the file an agent reads to learn what this artifact does.
Multi-cycle lifecycle management for Agile V. Requires agile-v-core loaded first.
C1, C2, ... -- recorded in STATE.md, propagated to all artifact IDs.
| Document | Rule | Example |
|---|---|---|
| REQUIREMENTS.md | Revision header + per-REQ status | <!-- Revision: C2 --> |
| BUILD_MANIFEST.md | ART-XXXX.N suffix | ART-0001.2 |
| TEST_SPEC.md | TC origin cycle | TC-0001 [C1] |
| VALIDATION_SUMMARY.md | One per cycle; prior archived | VALIDATION_SUMMARY_C1.md |
| DECISION_LOG.md | Cycle-tagged entries | [C2] DECISION: ... |
| ATM.md | Partitioned by cycle | See compliance-auditor |
approved [Cn] | modified [Cn] (was/now + CR ref) | new [Cn] | deprecated [Cn] | superseded [Cn]
Append-only in CHANGE_LOG.md. Format: CR-XXXX with Cycle, Affected REQ, Change, Rationale, Impact (ART + TC), Requested by, Approved status. Flow: Req Architect creates -> Logic Gatekeeper validates -> Human approves at Gate 1.
(1) New feature request. (2) Verification failure requiring REQ change. (3) Approved CR invalidating artifacts. (4) Scheduled iteration. All require Human decision.
| Trigger | Re-Entry | Scope |
|---|---|---|
| New feature | Stage 1 | Full pipeline new REQs; regression unchanged |
| REQ change from verification | Stage 1 | CR -> Gate 1 -> full affected; regression others |
| Bug fix (no REQ change) | Stage 3 | Build fixes; re-verify affected only |
| Scheduled | Stage 1 | Review all; full for changes; regression stable |
On Gate 2 acceptance: snapshot living docs -> .agile-v/cycles/CN/ (frozen). Never modify archives. DECISION_LOG and CHANGE_LOG never archived -- append-only timeline.
(1) Req Architect: tag REQs new/modified/deprecated/unchanged. (2) Logic Gatekeeper: re-validate new+modified only. (3) Build Agent: rebuild modified only; carry forward unchanged. (4) Test Designer: delta tests for new/modified; regression baseline for unchanged. (5) Red Team: execute delta + regression separately. (6) Compliance Auditor: cycle-tag ATM; flag unupdated links.